LPS24 planning tool

LPS24 planning tool Version 1.5

Circuit and power planning for the LPS24 central battery system (24 V)

  1. Select luminairesSelect up to 8 exit sign luminaire types and 8 emergency luminaire types for your project.
  2. Configure LPS unitsSelect the number of LPS units and the type, operating duration and number of circuits (2/4/6/8) for each unit.
  3. Assign luminaires to circuitsEnter quantities for each circuit – current, power and cable lengths are calculated instantly.

1Project details

2System & accessories

Maximum number of bus devices exceeded! (Number of LPS + FMT + BNW > 32)

3Luminaire selection

4Circuit planning

Limit exceeded per circuit: current > 3 A, power > 72 W, luminaires > 20 Maximum cable length at 20 °C (Cu), voltage drop ≤ 20% at 24 V

5Summary

GSYSTEMS GmbH accepts no liability! All information is non-binding and subject to change at any time. The customer and/or electrical design engineer is responsible for checking the factual, professional and technical accuracy and for approving execution. This technical drawing is protected by copyright and may not be reproduced, distributed or otherwise used, in whole or in part, without the express written permission of GSYSTEMS GmbH.